Fire door supply and fitting in England, Wales, Scotland and Northern Ireland sales@firedoor-installation.comGuide prices
Fire Door Installation

FD30 fire door installation in Daventry

Surveyed, supplied and fitted in Daventry. The everyday 30-minute fire door, supplied as a leaf or full doorset and fitted to its evidence.

Quote in Daventry

Free survey and a fixed written quote.

Prefer to talk? Call 0800 088 6248.

FD30 fire doors: our service in Daventry

When you book FD30 fire doors in Daventry, the aim is simple: doors that close, latch and seal as tested, with records that prove it.

In and around Daventry, fire door work covers everything from family homes after loft conversions to houses with integral garages. We plan each job around the people who use the building.

In Daventry, FD30 doors are the usual choice for escape-route corridors, stairs and kitchen doors where the fire strategy asks for 30 minutes. For a mixed portfolio in Daventry, we can survey every FD30 opening in one visit and price leaf-only and doorset options side by side.

What does a correct FD30 installation include?

A typical timber FD30 leaf is around 44mm thick and hangs on at least three fire-tested hinges. The gaps between leaf and frame are set to the manufacturer's data, usually around 3mm. Intumescent strips, and smoke seals where needed, go in the frame or leaf edge as specified. The closer must pull the door shut and latch it from any angle. Every hole cut for a lock, latch or hinge is lined with intumescent material where the certification calls for it.

Then comes the part that is often skipped: sealing the gap between the frame and the wall with a tested material, as BS 8214:2026 now sets out in more detail.

On a typical job that means:

  • Fire-tested hinges, latch or lock and intumescent pads
  • Frame-to-wall gap sealed with an evidenced material
  • Survey of the opening, frame and existing ironmongery
  • Intumescent strips and smoke seals to the certification

Which fire door rules apply in Daventry?

Fire doors in Daventry fall under English rules. New and replacement doors are covered by the Building Regulations 2010 and Approved Document B. In workplaces and the common parts of blocks, the Regulatory Reform (Fire Safety) Order 2005, as clarified by the Fire Safety Act 2021, puts the duty on the responsible person to keep fire doors suitable and maintained.

For residential buildings in Daventry above 11 metres, regulation 10 of the Fire Safety (England) Regulations 2022 adds checks: communal fire doors at least every three months and best-endeavours checks of flat entrance doors at least every twelve months. Higher-risk buildings of at least 18 metres or seven storeys also come under the Building Safety Act 2022, where works may need approval from the Building Safety Regulator.

Which buildings in Daventry need FD30 fire doors?

Landlords, managing agents, facilities teams and homeowners in Daventry can all commission FD30 fire doors from us. The usual settings are care homes and offices, though single doors for schools are just as welcome.

What happens after you enquire

  1. Measure the opening, check the frame and confirm the rating needed
  2. Order a certified leaf or doorset to size, with matching components
  3. Remove the old door and assess the frame or structural opening
  4. Fix the frame and hang the leaf to the certified gap tolerances
  5. Fit seals, hinges, latch, closer and signage, then test close-and-latch
  6. Seal the frame-to-wall gap, make good and record the evidence

What does FD30 fire doors cost in Daventry?

Budget around £300–£600 for a leaf into a sound existing frame; £650–£1,300 for a doorset, ex VAT for FD30 fire doors. Our guide prices are the same in Daventry as elsewhere; what changes the cost is the doors themselves. Use our guide-price tool for a quick estimate.

Around Daventry

We also cover towns near Daventry, including Rugby (14.5 km away), Northampton and Royal Leamington Spa. If your building is in NN11 or a neighbouring district, the service and pricing are the same.

Questions

Is Daventry within your coverage area?

It is. We cover Daventry in Northamptonshire and neighbouring towns such as Rugby. There is no charge for the survey.

How quickly can you survey in Daventry?

It depends on the number of doors and access, but we offer survey dates as soon as we reply to your enquiry. If an inspection has found urgent safety issues, tell us and we'll prioritise.

What is the difference between FD30 and FD30S?

FD30S has been tested for smoke control as well as fire. It adds a smoke seal, usually a brush or blade, and needs a tight threshold gap. Flat entrance doors and doors onto protected escape routes are commonly specified as FD30S.

Do FD30 doors need a closer?

Most do. Doors on escape routes, flat entrance doors and doors in the common parts of buildings need a self-closing device that shuts and latches the door. Some doors inside houses and locked riser doors are exceptions, depending on the fire strategy.

More FD30 fire doors in Northamptonshire

Talk to us about Daventry

Tell us about the doors and we will come back with survey dates and a fixed written quote.

CallGet a quote