What fire door frames in March should include
From the PE15 postcode district outwards, we take on fire door frames across March for homes, blocks and workplaces.
Buildings in and around March range from care homes to light industrial buildings and small offices. Whatever the building, the standard is the same: certified products, correct gaps, seals and closers, and a frame sealed to the wall.
We photograph every frame we fix in March before the architraves go on, so the hidden work is on record. Frame-to-wall gaps on March jobs are sealed with materials supported by the test evidence, as BS 8214:2026 sets out.
BS 8214:2026 and the frame-to-wall gap
The 2026 revision of BS 8214 strengthened its guidance on sealing the gap between the frame and the surrounding structure, listing material types such as stone wool, mastic and fire-rated foam, and putting the emphasis on using what the evidence supports. We fill and seal that gap with materials covered by the doorset's or sealant's test evidence and photograph it before the architraves go back on.
On a typical job that means:
- Assessment of frame condition and compatibility
- Architraves and making good
- Photographs of fixing and sealing before covering
- Hardwood or certified frames to suit the door
The regulations behind fire doors in March
Fire doors in March fall under English rules. New and replacement doors are covered by the Building Regulations 2010 and Approved Document B. In workplaces and the common parts of blocks, the Regulatory Reform (Fire Safety) Order 2005, as clarified by the Fire Safety Act 2021, puts the duty on the responsible person to keep fire doors suitable and maintained.
For residential buildings in March above 11 metres, regulation 10 of the Fire Safety (England) Regulations 2022 adds checks: communal fire doors at least every three months and best-endeavours checks of flat entrance doors at least every twelve months. Higher-risk buildings of at least 18 metres or seven storeys also come under the Building Safety Act 2022, where works may need approval from the Building Safety Regulator.
Which buildings in March need fire door frames?
From converted houses to schools, the requirement for fire door frames in March comes from the fire strategy or risk assessment for the building. We work from that document, or help you interpret your inspection report, before quoting.
From enquiry to handover in March
- Remove architraves and inspect frame fixing
- Decide repair, re-fix or replace
- Prepare the opening and fit the frame
- Pack and fix at specified centres
- Seal the frame-to-wall gap
- Photograph, fit architraves and make good
What does fire door frames cost in March?
As a guide, budget £250–£600 per frame replaced, fixed and sealed, ex VAT for fire door frames. The figure for your March building depends on the number of doors, the rating, the condition of the frames, finishes, hardware and access. We confirm a fixed price after the free survey.
Around March
We also cover towns near March, including Wisbech (13.6 km away), Ely and Peterborough. If your building is in PE15 or a neighbouring district, the service and pricing are the same.
Common questions
Do you work in March?
Yes, we take on fire door frames in March and the surrounding area, including Wisbech and Ely. Send your postcode and a few details and we'll come back with survey dates.
Can you work from an existing inspection report for my March building?
Yes. Send it over and we can often price straight from it, then confirm on site. We report back against the same door references so you can close actions off.
Can a new frame be fitted to my existing door?
Sometimes, if the frame is compatible with the door's certification. Often it is simpler and better evidenced to replace the whole doorset.
Can I use expanding foam around a fire door frame?
Only a fire-rated foam with evidence for that use and gap size. Ordinary expanding foam is not suitable.

